• Student VAIBHAV MAURYA
  • Code PG191090
  • Faculty Technology
  • Tutor/s Devang Patel,Krunal Mehta
  • TA Jaldeep Kabariya

295
views

I was allotted Reinforced Concrete Closely spaced girder bridge with precast girder system. Along with this, the substructure has rectangular pier cap, wall type pier and open foundation. The bridge was design for wind and seismic forces.