• Student Vatsal Shingala
  • Code UC5517
  • Faculty Technology
  • Tutor/s Reshma Shah

300
views

As a part of the Professional Training Course, I got the opportunity to work at this particular cable stayed bridge with a span of 640m. This bridge will be the second longest cable stayed bridge in India once completed. I observed construction activities like Fabrication and Erection of 110 Ton Bridge Deck Steel Segment, Casting of Pylon and  Stay Cable Installation and Stressing. Attached below are the images from the activity - Casting of Pylon