• Student SHAH HIREN JAYESHBHAI
  • Code PSD20129
  • Faculty Technology
  • Tutor/s Devang Patel,Krunal Mehta
  • TA Jaldeep Kabariya

208
views

The main objective of this Studio – IV Design of Bridges, is to understand and implement the basic design and analysis concept of a bridge including all its components like superstructure, substructure, and foundation. The problem statement provided to me is RCC closely spaced Girder with Wall Pier and Open Foundation.