• Student CHANDAN K
  • Code PSD20089
  • Faculty Technology
  • Tutor/s Devang Patel,Krunal Mehta
  • TA Jaldeep Kabariya

211
views

Project briefs Analysis and design of Bridge with 31.5m c/c EJ as a span of 3 Lane Highway Configuration with Pre Tensioned PSC Girder of Span 30m as Super Structure. Super Structure, Sub Structure, and Foundation are analyzed for all the necessary loads on the respective component of Bridge as per IRC 6 and IRC 112 and reference of IRC 71 for PSC pre-tensioned Girder for Superstructure.