• Student DWARIK HASIT TRIVEDI
  • Code PSD20113
  • Faculty Technology
  • Tutor/s Devang Patel,Krunal Mehta
  • TA Jaldeep Kabariya

140
views

Analysis, Design and Detailing of 30m span PSC Prestensioned girder superstructure with Wall type pier and Pile foundation. The location is Bhuj. The task was to apply the appropriate dead and live loads in accordance to the codal provisions and design the components for the respective governing load cases. The future scope of the project is  optimization of the components for more efficient output.