• Student JULIA CAROLINE J
  • Code PSD20156
  • Faculty Technology
  • Tutor/s Devang Patel,Krunal Mehta
  • TA Jaldeep Kabariya

143
views

The objective of this Studio is to design and analyze a RCC Girder bridge and all its components - superstructure, substructure, and foundation. The bridge was designed compiling to the IRC Standards, grillage method of analysis was adopted. The location considered was Ahmedabad and 24 m span with wall pier and open foundation.