- Student OZA DEV ABHAYBHAI
- Code PSD20099
- Faculty Technology
- Tutor/s Devang Patel,Krunal Mehta
- TA Jaldeep Kabariya
The Project briefs about the Structural Analysis of the 3 span RCC Continuous bridge located in Ahmedabad, Gujarat. The Project consists Superstructure of 3 span each having 30m length, Total width of Carriageway is 13.5m.The Project deals with the Designing & Detailing of Superstructure, Substructure & Foundation(SBC - 40 t/m2) for the Given Data.









