• Student Mohit Mungre
  • Code UCT20098
  • Faculty Technology
  • Unit L2 Studio Unit
  • Tutor/s Dipsha Shah,Dipen Mehta
  • TA Khyati Chandpa,Rushil Shah

166
views

There was a very deep study about plumbing services and designs. The project is designing plumbing services for hotel in which there are constraints OF 40% fresh water reduction and zero liquid discharge. Revit model is made to get an idea of cost estimation and quantity estimation. the overall focus of the design is on public health and water saving.