Abode Cast is constructed using precast elements, in order to construct in the given timeline, construction engineering topics like, planning & designing of moulds in the factory for elements, various job layouts & constraints, site & factory illumination & power requirements, time cycle in 3D, concrete pour planning & equipment productivity, erection cost & method statement for erection, productivity studies along with efficiency need to be done. Along with that other activities include reinforcement fabrication with rate analysis, safety hazards identification & prevention, quality issues at site & factory & challenges in basement construction need to be done.