- Student SOLANKI POOJA YASHWANTBHAI
- Code PSD21250
- Faculty Technology
- Unit L4 Studio Unit
- Tutor/s Devang Patel,Krunal Mehta
- TA Jaldeep Kabariya
The intent of the design of bridge studio was to study the various type of bridges along with their components, loadings and finally design and detail it. The allotted project was RCC girder with 22m span with 10.5m total carriage width. Loading and load combinations was determined with IRC 6. Load calculations, member designs were done manually along with the analysis in the STAAD Pro software. Super structure analysis carried out by grillage method in STADD Pro. Substructure and foundation analysis and Design is done manually.