FROZEN FOOD STORAGE INDUSTRIAL PEB BUILDING

  • Student SHAH HIREN JAYESHBHAI
  • Code PSD20129
  • Faculty Technology
  • Tutor/s Dhara Shah,Hrushikesh Patel
  • TA Poojan Patel

280
views

The objective is that the structure should sustain all the anticipated loads, deformation during and after the construction and should be fit for its purpose Initially the structural arrangement in relation to the requirements of the layout of equipment is planned. Accordingly, the initial Structural plan for the architectural plan is finished, the analysis, design & detailing of the Structure is done as per client requirement.