Ved-Veriav River bridge Surat
- Student GANDHI DISHANT BHARATBHAI
- Code UC2016
- Faculty Technology
- Tutor/s Reshma Shah,Abhi Jhaveri
- TA Mayurika Chakrabarti
The objective of project is to construct a bridge on Tapi river between Ved – Variyav
area in on E.P.C. basis.
Client: Surat Municipal Corporation Contractor: Vijay M. Mistry Construction Pvt. Ltd.
Total length of bridge is 1444.50 m. It is a 4 Lane bridge to be constructed within time limit of 32 months









