• Student VISHAKHA DHANRAJ UMATE
  • Code PCM20400
  • Faculty Technology
  • Tutor/s Jyoti Trivedi,Bhargav Dave,Paramjit Lota
  • TA Nimish Sharma,Keval Solanki

323
views

The studio Integrated Construction Practices focusses on exploring several BIM functionalities and Lean principles through a collaborative working approach. BIM execution plan was made and the stakeholders were brought together in a common data environment like BIM 360 for simultaneous modelling. Clash detection, clash quantification, and rule based checking, visual checking of model, design optimization, quantity take-off and cost estimation have been performed. LPS and other lean tools have been implemented for both the design and site execution process for a certain period which enabled continuous improvement in planning. For the same the Project selected was High rise Residential tower in GIFT City Gandhi Nagar.To meet the Objectives various tools such as BIM360, MIro boards, Google platforms, Visilean, Naviswork, Synchro, Revit  and Plannerly were being used.