To prevent wastewater from being discharged directly into rivers, sewage treatment plants are utilized to treat domestic sewage. A feasibility study for the construction of a 60 MLD sewage treatment plant in Gujarat was conducted as part of the studio, Construction Project Formulation, and Appraisal. Before reaching the sewage treatment facilities, the majority of the city's sewage runs via extensive stretches of the sewage system. This plant is being constructed to properly treat the raw sewage as part of the decentralization process. The studio concentrates on a project's development phase. Numerous studies are conducted on the project's context, demand, location, baseline, and economic viability. Based on the conclusions reached, the project's viability is determined.