• Student Margi Neev Chapani
  • Code UG190827
  • Faculty Design
  • Tutor/s Sadasivan Iyer,Shrenee Dudhaiya
  • TA Devvrat Sompura

146
views

A list of objectives that we had set for ourselves and achieved at the conclusion of the semester served as the starting point for the production process. The primary objective was the mass manufacture of building supplies. Corner shelf and roller curtains are my products. To start manufacturing, process mapping and BOM are produced using research and technical drawings of the selected items. The process of mass manufacturing is completed by an assembly line, and infographics aid in better comprehension.